Price list additional costs for standard installation

Valid from 2022-04-01 and until further notice. The prices are stated in SEK including VAT. Some of the additional costs are also included in the tax reduction for green technology*.

WorkPrice
Additional km in addition to 30 km, round trip (from the nearest office).SEK 23 per kilometer
Boom driving, booked visit where the customer is not on site and has not cancelled. As well as if the installation cannot be completed.SEK 1,750 + possibly kilometer fee
Insurance for separate visits incl. preliminary and final notification to electricity grid owners.SEK 3,313 + possibly kilometer fee
Replacement of the main fuse in connection with the installation. (Includes fuses and notification to the power grid company. Please note that a fuse leads to an increased cost for the power grid subscription.)SEK 1,563
Standard inspection. (Inspection to advise customer before installation)SEK 2,375 + possibly kilometer fee
Fee for new charge card.SEK 99
Hourly billing of a specialist, in the event of service/measurement at a charging station incl. travel time.SEK 1,250 per hour started
Hourly billing of technicians, in the event of errors caused by the customer or an installer hired by the customer incl. travel time.SEK 995 per hour started
Extra cable and clamping of cable, in addition to including 10 meters.SEK 138 per meter
Extra cable and clamping of cable, in addition to including 10 meters.SEK 163 per meter
Extra network cable and clamping of cable to energy meter, in addition to including 10 meters.SEK 57 per meter
Extra hole punching in wood/gypsum/lightweight concrete/leca, max 20cm.SEK 313 per hole punch
Drilling holes in concrete/brick, max 20cm.SEK 600 per hole punch
Ground laying of cable in existing pipe, (2.5mm2). (Presupposes that the customer has dug a 60 cm deep trench before installation, as well as laid empty pipe 50/42 mm with pull wire.)SEK 100 per meter
Installation of cable protection on the wall.SEK 313 per piece
Installation of a personal protective device or energy meter in a separate unit, indoors. Single line enclosure.SEK 1,180
Installation of personal protective equipment and energy meter in a separate unit, indoors. Double row casing.SEK 1,895
Installation of a personal protective device or energy meter in a separate unit, outdoors. Single line enclosure.SEK 1,990
Installation of personal protective equipment and energy meter in a separate unit, outdoors. Double enclosure.SEK 2,160
Retrofit of load balancing to existing Keba P30 charging box.SEK 8,500
Additional hourly cost (waiting time/extra work). (Billed per hour started)SEK 963 per hour
Complementary smart charging box 3.7 – 22 kW with outlet (not available for Garo GLB+).SEK 12,500
Complementary smart charging box 3.7 – 11 kW with fixed cable (not available for Garo GLB+).SEK 13,750
Installation and commissioning of supplementary charging box (not available for Garo GLB+).SEK 7,500
Installation and commissioning of two charging boxes at the same time (not available for Garo GLB+).SEK 12,500
Express installation (not available for Garo GLB+).SEK 8,500

*For more information on which costs can be included in the tax reduction for green technology, read more here.